McJunkin Red Man Corporation Building

Vernal, Utah

Arnie Eksund built a 120’ X 60’ metal building. The building is a mixed use warehouse and office space for rental purposes. UELS prepared construction documents for the 2nd story remodel from a mezzanine to office space. Later, the building was rented to McJunkin Redman Corporation, who requested that Mr. Eksund construct a 100’x60’ addition to add 6,000 sf to the existing warehouse space. UELS provided Architectural, Civil Engineering, and Structural Engineering services for the building.