138 kV Carbon To Ashley Transmission Line

Duchesne, County, Utah

UELS provided land surveying and drafting services for Rocky Mountain Power’s 138 kV Carbon to Ashley Transmission Line project.  The project entailed monitoring construction survey control and performing as-built survey on approximately 14,000 feet of 138kV High-Voltage Transmission Line. 

In addition to the survey services, our drafting team prepared As-Built right of way plats for the portion of the line that crosses Tribal Lands.  Our ROW plats are of the highest quality and we are continually praised for the clear concise detailing of our survey plats. 

UELS prides itself on the quality of our survey work for long transmission projects.  One of the challenges to these projects is carrying accurate survey control for the entire length of the project, and for this project Rocky Mountain Power was extremely satisfied with our work.